PORTFOLIO
   
HYDROGEOLOGIC WATER RESOURCE SERVICES
 
MODELING SERVICES
   
REMEDIATION SERVICES
 
WASTEWATER SERVICES
 
CONSTRUCTION SERVICES
   
NUCLEAR SERVICES
   
DRILLING & CPT SERVICES
   
SPECIALIZED SERVICES


CONSTRUCTION SERVICES

SEISMIC RETROFIT FOR COMMERCIAL FACILITIES

ART staff were involved with upgrading of basement structures for several hotels. The work involved installation of new foundation concrete pads and reinforced concrete retaining walls approximately 200 feet long located beneath the sidewalks and streets. The walls were up to 10 feet high and 12” to 16” thick.


COMMERCIAL AND RESIDENTIAL WORK

ART staff were involved in several projects in the commercial, restaurant & hospitality and multi-unit residential sectors. The projects involved framing, electrical, plubing, HVAC and ADA compliant work.


UST EXCAVATION & REMOVAL AND SEWER LINE CLEAN UPS

ART staff were involved with upgrading of basement structures for several hotels. The work involved installation of new foundation concrete pads and reinforced concrete retaining walls approximately 200 feet long located beneath the sidewalks and streets. The walls were up to 10 feet high and 12” to 16” thick.


FUEL FACILITY INSTALLATION
ART staff were involved with installation of the fuel system for a boiler room facility. The work included installation of two 20,000 gallons underground store tanks and associated piping, pumps and equipment.

CIVIL ENGINEERING / CONSTRUCTION OVERSIGHT

ART staff completed a contract for IT Corporation to provide civil engineering oversight for the safe removal and remediation of contaminated soil at 18 sites located at Hunter’s Point Naval Shipyard, in San Francisco, California. ART provided field surveying and management oversight of the project.


LEAD ABATEMENT / ASBESTOS REMOVAL

ART staff performed the project management of demolition and abatement activities associated with renovation of a 100,000 square-foot building located in San Francisco, California. The project involved the removal of the following:

  • Approximately 95,000 square feet of hazardous lead paint
     
  • Approximately 2,500 linear feet of asbestos pipe TSI, 35 asbestos pipe fittings, and 62,000 square feet of other ACM (roofing and flooring materials, wallboard).

SUMP EXCAVATION / UST REMOVAL / SEWER LINE CLEANUP

ART staff performed the following remedial activities of a petroleum and metal-impacted abandoned food facility located in San Francisco, California:

  • Excavation and disposal of USTs and associated product lines
     
  • Excavation and disposal of boiler room diesel product lines
     
  • Sludge removal and excavation of 12 concrete subsurface sumps
     
  • Sludge removal from 1,000 lineal feet of sewer line.

The project was completed satisfactorily even though there were no information that detailed the locations of USTs, sumps and product lines inside the building.

For more sample projects contact us at: info@applied.us.com
All rights reserved. © envosys 2025-26 : eServices : corporateWWWDEVplug. Site best viewed in 1024x780 pixels screen resolution.